SR. Reservoir Engineer
Endurance Resources III
Midland, TX

About $100,000 - $130,000 a year

Works closely on acquisition assessment, field development planning along with design and execution of well work. Strong ability to re-evaluate existing fields to establish optimal economic solutions. This will involve evaluation of uphole recompletions, re-stimulation, infill drilling, or adjustments in floods through surveillance and conformance work. The successful candidate will need to be a creative thinker that is willing to re-look at existing problems to maximize value. 5-8 years of Permian A&D experience. Central Basin Platform experience a Plus. PHDwin power user. Petroleum Engineer preferred. Midland/Dallas Location